2013
SUMMER'13
ELECTRON FLOW (exterior 2D)
20800
SITE: Willis Street Electrical sub station, Poplar, London.
PROJECT: Mosaic Mural
MATERIALS: Glass Smalti
COMMISSION: Poplar HARCA
DIMENSIONS: 6000 x 1800mm

![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
WINTER’13
THE LAST MARBLE (interior 3D)
20600
SITE: N/A.
PROJECT: Work for artist Harmen Brethouwer
MATERIALS: Marble on Polystyrene form
COMMISSION: Harmen Brethouwer
DIMENSIONS: 1800mm H
2012
AUTUMN’12
RUST RCGP (interior 2D)
20200
SITE: Royal College of General Practitioners, London.
PROJECT: Recycled Glass Mosaic Floor
MATERIALS: Recycled Glass
COMMISSION: RCGP/StructureTone
DIMENSIONS: 1800mm x 8000mm
SUMMER’12
AIM FOR THE STARS (interior 2D)
19100
SITE: Leicester University child psychiatric unit.
PROJECT: Mosaic Wall Panel - Memorial
MATERIALS: Italian Glass Smalti on Wedi
COMMISSION: Private Client
DIMENSIONS: 600mm x 2440mm
SPRING’12
ENTWINED HISTORIES (exterior 3D)
20000
SITE: Leopold Estate, Poplar, London.
PROJECT: Mosaic Sculpture
MATERIALS: Unglazed ceramic mosaic on GRC
COMMISSION: Poplar HARCA
DIMENSIONS: 850mm x 850mm x 3000mm
2011
AUTUMN’11
ROMAN BATH HOUSE (exterior 2D)
19800
SITE: Roman Garden, Pepper Street, Chester.
PROJECT: Commemorative Entrance Mosaic
MATERIALS: Unglazed ceramic, porcelain
COMMISSION: Chester Renaissance, Cheshire West & Chester Council
DIMENSIONS: 3.5m dia

![]()
THE ROMAN BATH HOUSE FRAGMENTS (exterior 2D)
19800
SITE: Roman Garden, Pepper Street, Chester.
PROJECT: Mosaic pavement fragments
MATERIALS: Unglazed ceramic, porcelain
COMMISSION: Chester Renaissance, Cheshire West & Chester Council
DIMENSIONS: 5m2
THE BROOK STREET MURAL (exterior 2D)
19700
SITE: Brook Street, Chester.
PROJECT: Mosaic courtyard feature
MATERIALS: Unglazed ceramic, porcelain
COMMISSION: Chester Renaissance, Cheshire West & Chester Council
DIMENSIONS: 2.5m dia
SPRING’11
MOSAIC HOUSE (exterior 2D)
19600
SITE: Mosaic House, Hemel Hempstead.
PROJECT: Mosaic courtyard feature
MATERIALS: Unglazed ceramic, porcelain
COMMISSION: Barratt Homes North London
DIMENSIONS: 2.5m dia
REDBRIDGE COMMUNITY PEACE MONUMENT (exterior 3D)
16900
SITE: High Street, Ilford, Essex.
PROJECT: Mosaic sculptural memorial
MATERIALS: Italian Glass Smalti, porcelain
COMMISSION: East Ilford Business Partnerships & KnifeCrime.org
DIMENSIONS: m
WINTER’11
WRIGHT BROS OYSTER HOUSE (interior 2D)
19400
SITE: Wright Bros, Soho Oyster House, London.
PROJECT: Mosaic seafood panels
MATERIALS: Unglazed ceramic
COMMISSION: Wright Brothers
DIMENSIONS: 1.5m x 1.5m
2010
RAINBOW MEMORIAL MOSAIC (exterior 3D)
19000
SITE: High Street, Hemel Hempstead.
PROJECT: Mosaic sculpture refurbishment
MATERIALS: Italian Glass Smalti
COMMISSION: Dacorum Borough Council
DIMENSIONS: m
EDGAR’S FIELD MOSAIC (exterior 3D)
18600
SITE: Edgar’s Field Park, Handbridge, Chester.
PROJECT: Mosaic sculpture for park refurbishment
MATERIALS: Unglazed ceramic
COMMISSION: Chester Council
DIMENSIONS: 1m x 2m x 1m
SUMMER’10
CHESTER AMPHITHEATRE MURAL (exterior 2D)
18700
SITE: Roman Amphitheatre, Pepper St, Chester.
PROJECT: Mural for retaining wall
MATERIALS: Keim Mineral Paints
COMMISSION: Chester Renaissance
DIMENSIONS: 100m x 04m
MOVEMENT & VITALITY MOSAIC (interior 2D)
18200
SITE: CRWC, University of Iowa, Iowa City.
PROJECT: Floor mosaics for new recreation centre
MATERIALS: Unglazed Ceramic and Glass
COMMISSION: University of Iowa
DIMENSIONS: 4m x 4m
RIVER OF LIFE MOSAIC (interior 2D)
18200
SITE: CRWC, University of Iowa, Iowa City.
PROJECT: Floor mosaic for new recreation centre
MATERIALS: Unglazed Ceramic and Glass
COMMISSION: University of Iowa
DIMENSIONS: 15m x 3m
2009
‘IT’S GOOD TO BE ME’ MOSAIC (exterior 2D)
17600
SITE: A40 Terrace Street Underpass
PROJECT: Kaleidascope mosaics with local primary school
MATERIALS: Glazed Ceramic, Printed Ceramic and Mirror
COMMISSION: Transport For London / Amey PLC
DIMENSIONS: 4 x 3.5m + 4 x 2.5m
REFLECTIONS IN THE RYHNES MOSAICS (exterior 2D)
18100
SITE: Loxton Road, Weston super Mare
PROJECT: Triptych floor mosaics
MATERIALS: Unglazed Ceramic and Glass
COMMISSION: North Somerset District Council
DIMENSIONS: 2x (1220mm dia) 1x (2840mm dia)
WINTER’09
FACE TO FACE YOUNG REFUGEES PROJECT (exterior 2D)
18300
SITE: TBA
PROJECT: Mural design facilitation project
MATERIALS: Design materials
COMMISSION: The Children's Society
DIMENSIONS: n/a
WINTER’09
DANSON DRAGON DESIGNS (design commission)
18000
SITE: Danson Park, Bexleyheath, Kent
PROJECT: Mosaic playground sculpture designs
MATERIALS: Design materials
COMMISSION: Bexley Borough Council
DIMENSIONS: n/a
2008
AUTUMN’08
LONDON WALL MURAL (interior 2D)
18300
SITE: Starbucks, London Wall, London EC2
PROJECT: Wall Mural
MATERIALS: Artists Acrylics on rendered wall
COMMISSION: Starbucks UK
DIMENSIONS: 6m x 2m approx
CARTERTON TOWER SQUARE MOSAIC (exterior 2D)
17800
SITE: Tower Square, Carterton, Oxfordshire
PROJECT: Floor mosaic focal feature
MATERIALS: Unglazed Ceramic and Glass
COMMISSION: Carterton Town Council
DIMENSIONS: 2000mm diameter
SPRING’08
MILL BECK SWANS MOSAIC (interior 2D)
17700
SITE: Mill Beck, Carlisle
PROJECT: Mosaic pavement
MATERIALS: Mixed Marbles
COMMISSION: Surface Design – Domus
DIMENSIONS: 3000mm diameter
BISHOPS WALK MOSAIC (exterior 2D)
17300
SITE: Valentines Park, Ilford, Essex
PROJECT: Mosaic pavement
MATERIALS: Unglazed ceramic and glass
COMMISSION: Redbridge Council/Crispin Borst
DIMENSIONS: 3000mm diameter
BHARUNDA BIRD MOSAIC (exterior 2D)
17200
SITE: Private residence, London
PROJECT: Mosaic wall panel
MATERIALS: Venetian Smalti
COMMISSION: Private
DIMENSIONS: 1000mm x 1300mm
2007
AUTUMN’07
MONKEY TABLE MOSAIC (exterior 2D)
17100
SITE: Private residence, London
PROJECT: Mosaic table
MATERIALS: Unglazed ceramic
COMMISSION: Private
DIMENSIONS: 30cm diameter
AUTUMN’07
CHICAGO FEATHERS MOSAIC (exterior 2D)
17000
SITE: Drummond School, Chicago, IL
PROJECT: School Mosaic with mosaic students COMMUNITY: Student project
MATERIALS: Unglazed ceramic and smalti glass
COMMISSION: Chicago Mosaic School
DIMENSIONS: 2 panels (647mm x 3315mm)
HUCKNALL GATEWAY MOSAIC COLUMN (exterior 3D)
16100
SITE: Hucknall, Nottingham
PROJECT: Mosaic panels for column
COMMUNITY: Consultation, design & workshops
MATERIALS: Unglazed ceramic and vitreous glass
COMMISSION: Campbell Design & Engineering
DIMENSIONS: 4 panels (715mm x 750mm)
SPRING’07
HOE STREET CHURCH MOSAIC (interior floor)
16700
SITE: Hoe Street Church, Leytonstone, London
PROJECT: Mosaic lobby floor
MATERIALS: Unglazed ceramic
COMMISSION: KICC - Bolt & Heeks
DIMENSIONS: 1.75m diameter circle
MEDUSA ROMAN GARDEN MOSAIC (exterior floor)
16600
SITE: Chelsea Flower Show
PROJECT: Trompe L’oeil ancient mosaic remains
MATERIALS: Unglazed ceramic
COMMISSION: Leeds City Council
DIMENSIONS: 1.75m diameter circle
EARTH CORE COLUMNS MOSAIC SCULPTURE (exterior 3D)
15300
SITE: Pedestrian Underpass, Erith, Kent
PROJECT: Community Design led, artist collaboration
COMMUNITY: Consultation, design & workshops
MATERIALS: Smalti Glass Mosaic & Metal Sections
COMMISSION: Bexley Council
DIMENSIONS: 5 columns (3m, 3.5m, 4m, 4.5m, 5m)
2006
AUTUMN’06
MINI BEASTS MOSAIC (exterior floor)
16400
SITE: Carpenters Nursery School, Stratford, London
PROJECT: Mosaic floor with pupils
COMMUNITY: Design and fabricate
MATERIALS: Glass & Ceramic Mosaic
COMMISSION: Carpenters School
DIMENSIONS: 2m diameter
AUTUMN’06
DEEP POND MOSAIC (exterior floor)
16300
SITE: Private Residence, London
PROJECT: Mosaic floor
MATERIALS: Glass & Ceramic Mosaic
COMMISSION: Private
DIMENSIONS: 2.4m diameter
ERITH FISH ROUNDABOUT MOSAIC SCULPTURE (exterior 3D)
15200
SITE: Erith Roundabout, Erith, Kent
PROJECT: Mosaic Sculpture
COMMUNITY: Consultation & workshops
MATERIALS: Glass Mosaic on Concrete form
COMMISSION: Bexley Borough Council
DIMENSIONS: 7.5m high
SPRING’06
ROMAN POOL MOSAICS (interior floors)
16000
SITE: Private residence, pool features
PROJECT: Floor Mosaic panels
MATERIALS: Ceramic Mosaic
COMMISSION: Oliver Laws Interior Design
DIMENSIONS: 800 x 800 + 1m x 1m
HOLYHEAD CELTIC GATEWAY (exterior wall)
15600
SITE: Market Street, Holyhead, Anglesey
PROJECT: Wall Mosaic
COMMUNITY: Consultation, design & workshops
MATERIALS: Venetian Smalti Mosaic
COMMISSION: Cywaith Cymru – Artworks Wales
DIMENSIONS:
2005
AUTUMN’05
CROSS KEYS MOSAIC FRIEZE (exterior wall)
15700
SITE: Cross Keys Public House, Erith, Kent
PROJECT: Mosaic Frieze
COMMUNITY: Consultation
MATERIALS: Ceramic Mosaic
COMMISSION: Bexley Borough Council
DIMENSIONS: 4m x 0.4m high
BODY & SPIRIT MOSAIC (interior wall)
14600
SITE: Lisburn Road Clinic, Belfast
PROJECT: Wall Mosaic
COMMUNITY: Consultation & workshops
MATERIALS: Glass & Ceramic Mosaic
COMMISSION: SE Belfast NHS Trust
DIMENSIONS: 2m dia
THAMES BARGE MURAL (exterior wall)
15100
SITE: White Hart Public House, Erith, Kent
PROJECT: Wall Mural
COMMUNITY: Consultation
MATERIALS: Artists Acrylic Paints
COMMISSION: Erith Town Forum
DIMENSIONS: 10m x 6m approx.
ST ANNES ARTS ARENA MOSAIC (exterior floor)
15000
SITE: Arts Arena, The Square, St Annes on Sea
PROJECT: Floor mosaic for performance area
COMMUNITY: None
MATERIALS: Ceramic Mosaic
COMMISSION: Lytham St Annes Borough Council
DIMENSIONS: 3m dia circle approx
2004
BEDFORD CASTLE MOSAIC (exterior floor)
14900
SITE: Castle Mound Gardens, Bedford.
PROJECT: Medieval Map floor mosaic
COMMUNITY: Consultation & workshops
MATERIALS: Ceramic Mosaic
COMMISSION: Bedford Borough Council
DIMENSIONS: .9 m dia circle approx
ROMAN STAG MOSAIC (exterior pool)
14800
SITE: Private Residence, Washington DC
PROJECT: Roman style mosaic for reflecting pool
COMMUNITY: n/a
MATERIALS: Vitreous ceramic mosaic
COMMISSION: Private
DIMENSIONS: .2.4m x 6m approx
SPRING’04
MAN & WOMAN MOSAICS (exterior floor)
14400
SITE: Petersfield Mansions, Cambridge.
PROJECT: Mosaic floor diptych for garden refurbishment
COMMUNITY: None
MATERIALS: Vitreous ceramic and glass mosaic
COMMISSION: Atkins Global Architects
DIMENSIONS: .150m2 approx
WELLING GATEWAY MURAL (exterior walls)
14200
SITE: Bellegrove Road Bridge, Welling, Kent.
PROJECT: Photo murals with local children and poetry workshop
COMMUNITY: Consultation & design
MATERIALS: Digital print from Photoshop and artwork
COMMISSION: Bexley Borough Council
DIMENSIONS: .50m x 1.2m approx
2003
AUTUMN’03
FRASCATI SUBWAY MOSAIC (exterior walls)
13800
SITE: Frascati Way Underpass, Maidenhead.
PROJECT: Collaboration with Poet on the theme of Maidenheads twin town
COMMUNITY: Poetry workshop
MATERIALS: Mosaic and paint
COMMISSION: Royal Borough of Windsor & Maidenhead
DIMENSIONS: .150m2 approx
SUMMER’03
ST CLOUD SUBWAY MURALL (exterior walls)
13800
SITE: St Clouds Way Underpass, Maidenhead.
PROJECT: Collaboration with Poet on the theme of Maidenheads twin town
COMMUNITY: Poetry workshop
MATERIALS: Mosaic and paint
COMMISSION: Royal Borough of Windsor & Maidenhead
DIMENSIONS: .150m2 approx
SPRING’03
BELLERAPHON MOSAIC (interior wall)
13900
SITE: AIG headquarters London
PROJECT: Micro-mosaic presentation panels
COMMUNITY: n/a
MATERIALS: Vitreous Ceramic, Smalti and Gold Mosaic
COMMISSION: JLT Group
DIMENSIONS: .1x 600mm dia 2x 300mm dia panels
WINTER’03
CERAMICS MOSAIC (interior walls)
13200-3
SITE: Welling School, Kent
PROJECT: Mosaic panel on ceramics
COMMUNITY: Consultation, design & fabricate
MATERIALS: Vitreous mosaic and mixed media
COMMISSION: Welling Arts Partnership
DIMENSIONS: .4 x (1.5m2)
WINTER’03
COMEDY & TRAGEDY MOSAIC (interior walls)
13200-1
SITE: Welling School, Kent
PROJECT: Mosaic panels on drama
COMMUNITY: Consultation, design & fabricate
MATERIALS: Vitreous mosaic and mixed media
COMMISSION: Welling Arts Partnership
DIMENSIONS: .4 x (1.5m2)
2002
AUTUMN’02
LEWISHAM STREET RHYTHMS MURAL (exterior wall)
13300
SITE: High Street, Lewisham
PROJECT: Photography and mural project with Poet
COMMUNITY: Consultation, design & workshops
MATERIALS: Film, Printing, Perspex, Artists acrylics
COMMISSION: Lewisham Regeneration Scheme
DIMENSIONS: 86m2 (1.22 x 71m)
AUTUMN’02
GEORGE AND THE DRAGON MOSAICS (exterior floor)
13200-4
SITE: Barrington Primary School, Welling
PROJECT: National Gallery Project - mosaic paving slabs
COMMUNITY: Design & fabrication
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: Welling Arts Partnership
DIMENSIONS: .14 x (600 x 600 slabs)
SUMMER’02
STAINES FOUNTAIN MOSAIC (exterior feature)
13100
SITE: High Street, Staines
PROJECT: Mosaic pond feature for Victorian Fountain
COMMUNITY: None
MATERIALS: Vitreous Glass Mosaic
COMMISSION: Spelthorne Borough Council
DIMENSIONS: .3m2
SPRING’02
STAINES MOSAICS (exterior floor)
12100
SITE: High Street, Staines
PROJECT: Mosaics for pedestrianisation project
COMMUNITY: None
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: Spelthorne Borough Council
DIMENSIONS: .9m2 + mosaic detail panels
100 YEARS OF THE SOUTH HIGH STREET MURALS (interior wall)
12500
SITE: Community Hall, Lincoln Central Methodist Church
PROJECT: Mural triptych on South High Street
COMMUNITY: Consultation & design
MATERIALS: Artists Acrylics on MDF
COMMISSION: Lincoln Central Methodist Church
DIMENSIONS: 3 x ( 6 feet x11 feet )
2001
AUTUMN’01
CINEMA NIGHTS MOSAIC (exterior floor)
11800
SITE: Astoria Court, Purley, Surrey
PROJECT: Mosaic floor for new build project
COMMUNITY: None
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: Camway Properties Ltd & Hart Associates
DIMENSIONS: 3m diameter
SPRING’01
PORTAVOGIE MURAL TRIPTYCH (exterior panels)
11700
SITE: Portavogie School, Portavogie, Northern Ireland.
PROJECT: Mural Triptych on the history of fishing
COMMUNITY: Consultation
MATERIALS: Artists Acrylics on exterior MDF
COMMISSION: Ards Arts Sculpture Trail
DIMENSIONS: 3x (8'x4')
SPRING’01
CLOUGHEY STONE MOSAIC SCULPTURE (exterior 3D)
11600
SITE: Cloughey, Northern Ireland
PROJECT: Lifeboat memorial
COMMUNITY: Consultation
MATERIALS: Granite with inlaid mosaic
COMMISSION: Ards Arts Sculpture Trail
DIMENSIONS: .2m high stone
WINTER’01
TOM PHILLIPS MOSAIC II (exterior wall)
11300-2
SITE: Bellenden Road, Peckham, London.
PROJECT: Mosaic collaboration with painter Tom Phillips
COMMUNITY: None
MATERIALS: Venetian Smalti
COMMISSION: Bellenden Housing Renewal Scheme
DIMENSIONS: .5m x 1.2m
SPRING’01
THE WAGSTAFF CENTRE (interior panels)
11500
SITE: The Wagstaff Centre, Wembley
PROJECT: 4 Mural panels for new office complex
COMMUNITY: n/a
MATERIALS: Artists Acrylics on MDF
COMMISSION: Wagstaff Group Ltd
DIMENSIONS: 4'x16', 8'x8', 3'x8', 2'x4' panels
WINTER’01
TOM PHILLIPS MOSAIC I (exterior wall)
11300-1
SITE: Bellenden Road, Peckham, London.
PROJECT: Mosaic collaboration with painter Tom Phillips
COMMUNITY: None
MATERIALS: Venetian Smalti
COMMISSION: Bellenden Housing Renewal Scheme
DIMENSIONS: .7m x 1.6m
WOOLWICH WATERFRONT MURAL (interior wall)
11200
SITE: Main lift area, QE Hospital, Woolwich.
PROJECT: Mural on the working river at Woolwich
COMMUNITY: None
MATERIALS: Artists Acrylics on MDF panels
COMMISSION: Greenwich Healthcare NHS Trust
DIMENSIONS: .1.2m x 7.4m
2000
ONE TOWN THAT CHANGED THE WORLD MURAL (exterior wall)
10600
SITE: One Bell Corner, Dartford High Street, Dartford, Kent.
PROJECT: Mural on Dartford’s Industrial Heritage
COMMUNITY: None
MATERIALS: Artists Acrylics on cement render
COMMISSION: Dartford Borough Council
DIMENSIONS: .5m x 9m
AUTUMN’00
BRITWELL MOSAIC SUNDIAL (exterior plinth)
10900
SITE: Monksfield Park, Slough.
PROJECT: Community mosaic sundial, landmark feature
COMMUNITY: Consultation, design & workshops
MATERIALS: Ceramic with glass mosaic (concrete & steel)
COMMISSION: Slough Borough Council
DIMENSIONS: .3m diameter circle
SUMMER’00
MOSAIC GARDEN BENCHES (exterior benches)
10400-2
SITE: East Park redevelopment for central Southampton.
PROJECT: Mosaic inlaid stone benches
COMMUNITY: None
MATERIALS: Vitreous ceramic &glass in portland stone
COMMISSION: Landscape Design Associates
DIMENSIONS: .4 benches
SUMMER’00
SOUTHAMPTON MOSAIC GARDEN (exterior floor)
10400-1
SITE: East Park redevelopment for central Southampton.
PROJECT: Mosaic garden feature
COMMUNITY: None
MATERIALS: Vitreous ceramic with glass mosaic
COMMISSION: Landscape Design Associates
DIMENSIONS: .6m diameter circle
SPRING’00
PLAY MURAL (exterior panels)
09800
SITE: Playground, Thorpe Hall School, London, E17.
PROJECT: Mural designed and painted with pupils
COMMUNITY: Design & workshops
MATERIALS: Artists acrylics on WBP ply panels
COMMISSION: Thorpe Hall School
DIMENSIONS: .1.2m x 17m
WINTER’00
BAD GODESBERG SUBWAY MURAL (exterior walls)
10100
SITE: Bad Godesburg Way Underpass, Maidenhead.
PROJECT: Maidenheads twin town project
COMMUNITY: Poet collaboration
MATERIALS: Mosaic and paint
COMMISSION: Royal Borough of Windsor & Maidenhead
DIMENSIONS: .150m2 approx
WINTER’00
CHINGFORD HERITAGE MOSAIC (exterior wall)
10200
SITE: Chingford Library
PROJECT: Mosaic celebrating Chingford's Heritage
COMMUNITY: None
MATERIALS: Ceramic and Glass mosaic
COMMISSION: London Borough of Waltham Forest
DIMENSIONS: .
1999
AUTUMN’99
HYGIEIA MOSAIC (interior panel)
10500
SITE: Postgrad centre, Greenwich District Hospital.
PROJECT: Mosaic wall panel on goddess of medicine
COMMUNITY: None
MATERIALS: Vitreous Glass & Ceramic mosaic on Wedi
COMMISSION: Greenwich Healthcare NHS Trust
DIMENSIONS: .2.5 x 1m
AUTUMN’99
TRADE TRAIL II MOSAICS (exterior panel)
09500
SITE: Northgate & Southgate pedestrianisation project, Gloucester.
PROJECT: 6 Mosaic floor panels (extension to Spring’98 commission)
COMMUNITY: Consultation, design & workshops
MATERIALS: Vitreous Ceramic mosaic in steel trays
COMMISSION: Gloucester City Council
DIMENSIONS: .1(1.5x1.5m) 5(1x1m)
SUMMER’99
THE SNOWSFIELD MURAL (interior panel)
09900
SITE: Snowsfield Adolescent Unit, Guy’s Hospital
PROJECT: Mobile mural with young people.
COMMUNITY: Consultation, design & fabrication
MATERIALS: Artists Acrylics and fabric on MDF/velcro panels
COMMISSION: Guy’s & St Thomas’ NHS Trust
DIMENSIONS: .
SUMMER’99
THE BHARUNDA BIRD MURAL (interior panel)
09600
SITE: Level 3 corridor, Gt. Ormond Street Hospital
PROJECT: Design and paint a mural with children at the Hospital School.
COMMUNITY: Design & fabrication
MATERIALS: Artists Acrylics on MDF
COMMISSION: Great Ormond Street NHS Trust
DIMENSIONS: .
SPRING’99
EVERSHOLT PARISH MAP MOSAIC (exterior wall)
08400
SITE: Gable wall, Eversholt Village Hall.
PROJECT: Community parish map mosaic
COMMUNITY: Consultation, design & fabrication
MATERIALS: Vitreous Glass & Ceramic Mosaic
COMMISSION: Eversholt 2000
DIMENSIONS: .3m x 3m
WINTER’99
WELLINGBOROUGH WELLS MOSAIC (exterior floor)
09300
SITE: Market Street & Sheep Street.
PROJECT: Floor Mosaic
COMMUNITY: None
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: Wellingborough Borough Council
DIMENSIONS: .39m2
1998
AUTUMN’98
WELLINGBOROUGH TWIN TOWN MOSAIC (exterior floor)
09200
SITE: Market Street & Pebble Lane.
PROJECT: Floor Mosaic
COMMUNITY: None
MATERIALS: Vitreous Ceramic Mosaic & Yorkstone setts
COMMISSION: Wellingborough Borough Council
DIMENSIONS: .6m dia circle
AUTUMN’98
SIGNS OF LIFE MOSAIC SCULPTURE (exterior 3D)
07700
SITE: Bede Island, Bede Park, Leicester.
PROJECT: Central Square community sculpture
COMMUNITY: Consultation, design & workshops
MATERIALS: Carved stone with mosaic inlay
COMMISSION: Leicester City Challenge
DIMENSIONS: .7m circle of 6 stones
SUMMER’98
PETER PAN MURAL (interior panel)
08200
SITE: New Wing, General Surgery corridor, Great Ormond Street Hospital
PROJECT: Design and paint a mural with children at the Hospital School.
COMMUNITY: Consultation, design & fabrication
MATERIALS: Artists Acrylics on MDF
COMMISSION: Great Ormond Street NHS Trust
DIMENSIONS: .5 x ( 8'x4')
SUMMER’98
RUNCORN FOUNTAIN MURAL (exterior panel)
09000
SITE: Halton Partnership Centre, Runcorn
PROJECT: Mural panel
COMMUNITY: None
MATERIALS: Artists Acrylics on Marine Ply
COMMISSION: Halton Borough Council
DIMENSIONS: .2m x 3m
SUMMER’98
TRINITY HOSPITAL MOSAIC (exterior floor)
08800
SITE: Seating area by Castle Bridge, Leicester.
PROJECT: Floor mosaic
COMMUNITY: None
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: Leicester City Challenge
DIMENSIONS: .2m dia circle
SPRING’98
HAMPTON COURT/NUFFIELD GARDEN MOSAICS (exterior panel)
08300
SITE: Guildford Hospital / Hampton Court.
PROJECT: School mosaic project for Garden Show
COMMUNITY: Design & fabrication
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: Nuffield/ JWP Landscape Architects
DIMENSIONS: .16x(450 x 450mm) panels
SPRING’98
GLOUCESTER TRADE TRAIL MOSAICS (exterior panel)
08100
SITE: Northgate & Southgate pedestrianisation project, Gloucester.
PROJECT: 5 Mosaic floor panels
COMMUNITY: Consultation, design & workshops
MATERIALS: Vitreous Ceramic mosaic in steel trays
COMMISSION: Gloucester City Council
DIMENSIONS: .1(1.5x1.5m) 4(1x1m)
SPRING’98
APOLLO MOSAIC (interior panel)
08600
SITE: Foyer entrance, Greenwich District Hospital
PROJECT: Mosaic for refurbishment
COMMUNITY: None
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: Greenwich Healthcare NHS Trust
DIMENSIONS: .1m x 1.5m
WINTER’98
MAYVILLE RAINFOREST MURAL (exterior wall)
08500
SITE: Playground, Mayville School, London E11.
PROJECT: Rainforest mural designed and painted with pupils.
COMMUNITY: Consultation, design & fabrication
MATERIALS: Artists acrylic on cement render
COMMISSION: Waltham Forest Business Partnership.
DIMENSIONS: .3m x 6m
WINTER’98
THOSE WHO WERE HERE BEFORE MOSAIC (exterior stairs)
07400-2
SITE: The Point, Art Centre, Doncaster.
PROJECT: Mosaic Stair Risers
COMMUNITY: Consultation & design
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: DARTS: Doncaster Community Arts.
DIMENSIONS: .3m2
THOSE WHO WERE HERE BEFORE MOSAIC (exterior floor)
07400-1
SITE: The Point, Art Centre, Doncaster.
PROJECT: Mosaic Floor haiku
COMMUNITY: Consultation, poetry workshop & design
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: DARTS: Doncaster Community Arts.
DIMENSIONS: .3m2
WINTER’98
THE WOOD MURAL (interior panel)
07100
SITE: New Oncology Outpatients, Cheltenham General Hospital.
PROJECT: Mural for corridor area
COMMUNITY: None
MATERIALS: Artists Acrylics on MDF
COMMISSION: East Gloucestershire NHS Trust.
DIMENSIONS: .10 x (8' x 4')
1997
AUTUMN’97
WORLD FEAST MURALS (interior panel)
07800 SITE: Restaurant, Greenwich District Hospital.
PROJECT: 4 Mural panels
COMMUNITY: None
MATERIALS: Artists Acrylics on MDF
COMMISSION: Greenwich Healthcare NHS Trust.
DIMENSIONS: .4 x (8'x4' panels)
AUTUMN’97
LANGLEY FUNDAY MURALS (exterior panel)
07500
SITE: Playground area, Langley, Slough
PROJECT: Mural panels funday event
COMMUNITY: Design & fabrication
MATERIALS: Artists Acrylics on MDF
COMMISSION: Slough Borough Council.
DIMENSIONS: .12m2
SUMMER’97
AROUND THE WORLD MURALS (interior 3D & panel)
06600
SITE: Paediatric Outpatients, Watford General Hospital. Refurbishment.
PROJECT: Mural environment and play structures
COMMUNITY: None
MATERIALS: Artists Acrylics on MDF
COMMISSION: Watford & Mount Vernon NHS Trust.
DIMENSIONS: .
SUMMER’97
FOUR SEASONS MOSAIC (exterior wall)
06900
SITE: Barclay School. London E10.
PROJECT: Joint School and 6th form college Mosaic
COMMUNITY: Consultation, design & fabrication
MATERIALS: Vitreous Glass & Ceramic Mosaic
COMMISSION: Waltham Forest Business Partnership
DIMENSIONS: .4 x (1m x 1m mosaic panels)
SPRING’97
NORWOOD ROOTS MOSAIC (exterior panel)
06400
SITE: Railway bridge at South Norwood.
PROJECT: Community Mosaic on the theme ‘Roots, Routes, Roots’ & Agenda 21
COMMUNITY: Consultation, design & fabrication
MATERIALS: Glass and ceramic mosaic
COMMISSION: Commissioned by London Borough of Croydon.
DIMENSIONS: 25m2.
WINTER’97
CLASSICAL TROMPE L'OEIL MURAL (interior wall)
06500
SITE:Private House, Croydon.
PROJECT: Trompe L’Oeil doorway
COMMUNITY: n/a
MATERIALS: Artists Acrylics on plaster
DIMENSIONS:
COMMISSION: Private.
WINTER’97
GLEVUM 97AD MOSAIC (interior panel)
06800
SITE: Gloucester City Museum.
PROJECT: Commemorative Mosaic in Roman style
COMMUNITY: n/a
MATERIALS: Vitreous Ceramic Mosaic
COMMISSION: Gloucester City Council
DIMENSIONS:
1996
AUTUMN’96
GUARDIANS OF THE GATE MOSAICS (exterior wall)
05900
SITE: Ching Way entrance, Chingford Hall Estate, Waltham Forest.
PROJECT: Community Mosaic
COMMUNITY: Consultation, design & fabrication
MATERIALS: Glass and ceramic mosaic
COMMISSION: Commissioned by Waltham Forest HAT & All Change Arts.
DIMENSIONS: 16m2.
SUMMER’96
TROMPE L’OEIL -Blackheath MURAL (interior wall)
06300
SITE: 42 St.John’s Park, Blackheath, SE3.
PROJECT:Trompe L’Oeil doorway
COMMUNITY: n/a
MATERIALS: Artists Acrylics plaster wall.
COMMISSION: Commissioned by David Thomas.
DIMENSIONS: 214 x 105.
SUMMER’96
HISTORY OF MEDICAL SCIENCE MURAL (interior panel)
05400
SITE: Outpatients Waiting Hall.
PROJECT: Mural arch
COMMUNITY: None
MATERIALS: Artists Acrylics on Boards.
COMMISSION: Commissioned by King’s College Hospital Special Trustees.
DIMENSIONS: 40' x 15'.
FISHPOND MOSAIC (exterior floor)
05700
SITE: Junction Bedford Road /Sydenham Road, Croydon.
PROJECT: Floor Mosaic
COMMUNITY: None
MATERIALS: Vitreous Ceramic and Glass.
COMMISSION: Commissioned by London Borough of Croydon.
DIMENSIONS: 2m diameter circle.
WINTER’96
NEW YORK SKY MURAL (interior ceiling)
06000
SITE: The Baltimore Exchange Bar, Nottingham..
PROJECT: Ceiling sky painting
COMMUNITY: n/a
MATERIALS: Artists Acrylics onto ceiling.
COMMISSION: Commissioned by Leisure Effects Ltd.
DIMENSIONS: 15'x95".
1995
SPRING'95
THE GREAT FLOOD MURAL FRIEZE (interior panel)
04000
SITE:Greenwich District Hospital, London, SE10.
PROJECT: Frieze for New Paediatric A&E Unit.
COMMUNITY: Consultation
MATERIALS: Artists Acrylic on MDF.
COMMISSION: Commissioned by Greenwich Healthcare (NHS) Trust.
DIMENSIONS:
1994
WINTER'94
SUTTON HERITAGE MOSAIC (exterior wall)
03400
SITE: Town Centre Square, Sutton High Street.
PROJECT: Large mosaic portraying Sutton's heritage.
COMMUNITY: Consultation, design & workshops
MATERIALS: 20mm Ceramic mosaic.
COMMISSION: Commissioned by London Borough of Sutton.
DIMENSIONS: 5m x 7m – TIMESCALE: 20 weeks.
1993
SUMMER'93
SUTTON TWIN-TOWN MURAL (exterior panel)
03000
SITE: Gable End Window recesses, Sutton.
PROJECT: Mural designed with local schools and community groups.
COMMUNITY: Consultation & design
MATERIALS: Artists Acrylics on plywood panels.
COMMISSION: Commissioned by L.B.Sutton.
DIMENSIONS: 7 panels 10m22 approx – TIMESCALE: 10 weeks.
WINTER'93
MARSH FARM MOSAICS (exterior wall)
02600
SITE: Marsh Farm shopping precinct, Luton.
PROJECT: Mosaic with local schools and community groups.
COMMUNITY: Consultation, design & fabrication
MATERIALS: Ceramic and Glass mosaic tiles.
COMMISSION: Commissioned by Luton MBC Percent for Art scheme.
DIMENSIONS: 15m2 – TIMESCALE: 12 weeks.
1992
HOCKWELL RING MURAL (exterior wall)
02300
SITE: Hockwell Ring Community Centre, Luton.
PROJECT: Mural with local children.
COMMUNITY: Consultation, design & fabrication
MATERIALS: Acrylic on rendered cement.
COMMISSION: Commissioned by Princes Trust, Luton MBC, Eastern Arts.
DIMENSIONS: 50m2 – TIMESCALE: 4 weeks.
SPRING'92
UPHALL JUNIOR SCHOOL MURAL (exterior wall)
02400
SITE: Uphall School, Ilford, Essex.
PROJECT: School playground mural
COMMUNITY: Design workshops
MATERIALS: Acrylics on cement render.
COMMISSION: Working with Greenwich Mural Workshop.
DIMENSIONS: 2.7m x 21m. – TIMESCALE: 4 Weeks.
1991
SUMMER'91
GIRDLESTONE PANORAMA MURAL (interior wall)
01800
SITE:Girdlestone Community Centre, London N19.
PROJECT: Panorama environment mural.
COMMUNITY: Consultation
MATERIALS: Acrylic on brick and brieze block walls.
COMMISSION: Commissioned by Girdlestone Users Group & L.B.Islington.
DIMENSIONS: 150 m2 approx. – TIMESCALE: 8 Weeks
WINTER'91
THE ARSENAL MURAL PROJECT (exterior 3D)
01600
SITE:Woolwich Market and Greenwich Citizens Gallery
PROJECT:Arts project about the Woolwich Arsenal. Installation with Woolwich College.
COMMUNITY: Consultation, design & fabrication
MATERIALS: Emulsion on battened hardboard.
COMMISSION: Commissioned by The Citizens Gallery and L.B.Greenwich.
DIMENSIONS: 3 Prisms 3 x (8' x 12'). – TIMESCALE: 4 Days.
1990
AUTUMN'90
YOUTH BUS PAINTING PROJECT (exterior)
01500
SITE: Double Decker Bus.
PROJECT: Design and painting of Double Decker Bus with young people from Hoddlestone.
COMMUNITY: Consultation, design & fabrication
MATERIALS: Tekaloid Coach Enamels.
COMMISSION: Commissioned by East Herts County Council, EHPBA, GLAXO and Eastern Arts.
DIMENSIONS: Daimler Double Decker Bus. – TIMESCALE: 8 Consecutive weekends.
SUMMER'90
OL'MACDONALD MURAL PANORAMA (exterior wall)
01200
SITE: Playground, Clerkenwell Parochial School, London WC1.
PROJECT: Playground mural
COMMUNITY: Consultation
MATERIALS: Keim on concrete render.
COMMISSION: Commissioned by L.B.Islington Architects.
DIMENSION: 3m x 50m. – TIMESCALE: 12 Weeks.
SPRING'90
THE LAST GREAT NORTHERN HIPPO SHOW (exterior sets)
00000
SITE: Community Opera, Leeds University.
PROJECT: Community Opera backdrop & carnival float
COMMUNITY: Design
MATERIALS: Emulsion on canvas and set and carnival float painting.
COMMISSION: Commissioned by Opera North.
DIMENSIONS: 40' x 30'. – TIMESCALE: 1 Week.
WINTER'90
SUNBURST MOSAIC (exterior wall)
01100
SITE: Archway Underpass, London N19.
PROJECT: Mosaic.
COMMUNITY: Consultation
MATERIALS: 20 x 20mm Vitreous Glass Mosaic.
COMMISSION: Commissioned by L.B.Islington, Community Forum & Neighbourhood Office.
DIMENSIONS: 4m x 4m. – TIMESCALE: (Construction off site 7 weeks) fixing on site 3 Days.
1989
LOVE OVER GOLD MURAL (exterior wall)
01000
SITE: Drake House, Deptford, London SE6.
PROJECT: Mural based on the work from 9 local Primary Schools.
COMMUNITY: Consultation, design & workshops
MATERIALS: Keim on rendered concrete.
COMMISSION: Commissioned by L.B.Lewisham, Outset UK, Dire Straits, ILEA.
DIMENSIONS: 3m x 30m. – TIMESCALE: 8 Weeks.
WINTER'89
FAIRGROUND MURAL (interior wall)
00900
SITE: Despard Road Underpass, London N19.
PROJECT: Mural.
COMMUNITY: None
MATERIALS: Eggshell on glazed tiles.
COMMISSION: Commissioned by L.B.Islington, Archway Neighbourhood Office.
DIMENSIONS: Walls & Ceiling 2.2m x 8.2m x 3m. – TIMESCALE: 2 Weeks.
1988
AUTUMN'88
ABSTRACT PHASE II MURAL (interior wall)
00800
SITE: Archway Underpass, London N19.
PROJECT: Mural.
COMMUNITY: Consultation
MATERIALS: Eggshell on tiles.
COMMISSION: Commissioned by L.B.Islington, Archway Neighbourhood Office.
DIMENSIONS: 2.2m x 50m. – TIMESCALE: 10 Weeks.
SPRING'88
ABSTRACT PHASE I MURAL (interior wall)
00700
SITE: Archway Underpass, London N19.
PROJECT: Mural.
COMMUNITY: Consultation
MATERIALS: Eggshell on tiles.
COMMISSION: Commissioned by L.B.Islington, Archway Neighbourhood Office.
DIMENSIONS: 2.2m x 61.6m. – TIMESCALE: 10 Weeks.
1987
HISTORY OF THE PEOPLES PALACE MURALS (interior wall)
00100
SITE: Alexandra Palace, West Corridor, London N22.
PROJECT: Murals on The Palaces' history.
COMMUNITY: None
MATERIALS: Keim on concrete render.
COMMISSION: Commissioned by Alexandra palace Trust (Taylor Woodrow contract managers).
DIMENSIONS: Ten Panels- Nos1-4 & 6 3.5m x 3.75m Nos 5 5.25m x 2.4m Nos 7-10 5.25m x 3.75m. – TIMESCALE: 13 Weeks.
SPRING'87
WEST GREEN CHILDREN'S MURAL (exterior wall)
00200
SITE: West Green Library Tottenham, London N17.
PROJECT: Mural with children from West Green School.
COMMUNITY: Design & fabrication
MATERIALS: Emulsion on flush rendered brick.
COMMISSION: Commissioned by L.B.Haringey & Haringey Arts Council.
DIMENSION: 8' x 36'. – TIMESCALE: 3 Weeks.
1986
SUMMER'86
THE OLIVER TWIST MURAL FRIEZE (interior panel)
00007
SITE: North Middlesex Hospital, London N19.
PROJECT: Mural, frieze for 150th Anniversary of the publication of Oliver Twist.
COMMUNITY: Consultation
MATERIALS: Enamel Paints on Mahogany Ply.
COMMISSION: Commissioned by Haringey Health Authority & MSC.
DIMENSIONS: 2' x 64'. – TIMESCALE: 16 Weeks.
SPRING'86
HISTORY OF THE TUC MURAL (interior wall)
00005 SITE:TUC National Education Centre, London.
PROJECT: Mural on the TUC's history.
MATERIALS: Artists Acrylics on rendered wall.
COMMISSION: Assisting mural artist Des Rochfort.
DIMENSIONS: 3m x 15m.
WINTER'86
DOCKLANDS HISTORY MURAL PANELS (interior panel)
00003
SITE:Whittington Hospital London N19.
PROJECT: Mural on the London Docks.
COMMUNITY: Consultation
MATERIALS: Enamel Paints on Mahogany Ply.
COMMISSION: Commissioned by Haringey Health Authority & MSC.
DIMENSIONS: 4' x 12'. – TIMESCALE: 6 Weeks.
1985
SUMMER'85
PEASANTS REVOLT MURAL (interior panel)
00001
SITE: St.Anne's Hospital, Tottenham, London N17.
PROJECT: Mural in Medieval Style.
COMMUNITY: Consultation
MATERIALS: Enamel Paints on Mahogany Ply .
COMMISSION: Commissioned by Haringey Health Authority & MSC.
DIMENSIONS: 4' x 8'. – TIMESCALE: 2 Weeks.
---